Contact us for a detailed quotation and specifications sheet.
Send InquiryTell us your project · We respond within 24 hours
The UPSEN UTD40S is a tracked mobile stacker conveyor built for continuous duty in quarrying, concrete recycling and demolition work. Its rated output is 150-300 t/h, fed from a 4200×2200 mm hopper and taking material up to — at the inlet.
The unit travels as one load on a low-bed trailer — 11300×2200×2550 mm and 12,000 kg — and is driven by 54 kW, so no site power supply is needed. Steel tracks let the operator reposition the plant as the working face advances.
When specifying a tracked mobile stacker conveyor, always match the throughput of the crusher with the downstream screening and stockpiling equipment, and check the maximum feed size against the material you actually run. An oversized inlet wastes fuel; an undersized one causes bridging and blocked jaws.
| Model | Capacity | Max. feed size | Total weight |
|---|---|---|---|
| UTD40S (this model) | 150-300 t/h | — | 12,000 kg |
| UTD35 | 30-100 t/h | — | 4,600 kg |
| UTD65 | 150-400 t/h | — | 11,000 kg |
| UTD65S | 600 t/h | — | 22,500 kg |
Based on rated capacity, the following UPSEN units are usually specified together with the UTD40S:
Rated capacity is 150-300 t/h. Actual output depends on the material, the feed size and the discharge setting.
The UTD40S accepts material up to —.
12,000 kg, transport size 11300×2200×2550 mm. It can be moved on a standard low-bed trailer without dismantling.
54 kW.
Yes — UPSEN machines are CE certified and leave the factory ready for work. Delivery is by sea (container or flat rack) to major ports.
A single tracked unit rarely does everything — pair the UTD40S with the equipment below to build a working line.